Back to the blog

Spreadsheet or ERP: How to Choose for an SME in West Africa

Spreadsheets, general-purpose software, or ERP: an honest decision-making guide for a West African SME, including costs in CFA francs. This includes the cases—more numerous than is often acknowledged—where a spreadsheet is still sufficient.

Spreadsheet or ERP: the question never arises in the abstract; it arises when faced with a file named GESTION_2025_final_V3_OK.xlsx. It’s 40 MB, takes two minutes to open, and only one person in the company knows why column M is red. That person is on vacation. The question “How many bags are left in stock?” turns into an investigation, and the answer arrives after the customer does. It’s usually at this exact moment that a business owner starts looking for another tool for their small business.

The search quickly turns into a cacophony: a cousin recommends imported software, a salesperson promises a full-featured ERP system in two weeks, and a developer offers to build everything from scratch. All three may be right—for three different companies. This article provides an honest decision-making framework comparing spreadsheets, off-the-shelf software, and ERP systems, with cost ranges in CFA francs, and it reaches a conclusion that few vendors are willing to state: in some cases, a spreadsheet is still sufficient.

Spreadsheets or ERP: Actually, Three Families of Tools

The spreadsheet

Excel, Google Sheets, LibreOffice Calc. No training costs, total flexibility, virtually no cost. The spreadsheet is a calculation tool repurposed as a management tool: it has no robust access controls, no reliable revision history, and no concept of transactions. It does what you tell it to do—including accidentally overwriting a row.

Generic software or industry-specific SaaS

A ready-made product that you configure: invoicing, point-of-sale, inventory management, payroll. You’re buying someone else’s logic. This is an advantage when your business is standard, but a disadvantage when it isn’t. Watch out for the most common local pitfall: many foreign products do not support Mobile Money, the FCFA without decimals, the SYSCOHADA chart of accounts, or the certified invoice format required by Beninese regulations.

A Custom-Configured or Custom-Developed ERP

A single system that integrates sales, inventory, purchasing, accounting, and HR, tailored to your organization. Two distinct categories that should not be confused: an existing ERP system that we configure for you (with controlled timelines and costs), and a complete custom development (significantly higher costs and longer timelines, but with total control). The question isn’t “which one is better” but “what part of my business is truly unique.” One point that often causes unnecessary concern: the technology used is not a deciding factor for a business leader. You don’t buy a development environment; you buy a result. At IK'ART, we select the environment best suited to your project, your constraints, and your teams, and if you already have an existing system or a technical preference, we work with it rather than against it.

When a spreadsheet is still enough

An unpopular but true answer: often. If your situation checks off most of the items on this list, switching tools will cost you time and money without delivering any benefits.

  • Fewer than three people enter data, and never at the same time.
  • Fewer than twenty invoices per day.
  • No inventory, or an inventory of fewer than 100 SKUs that moves slowly.
  • A single business location.
  • Your external accountant takes over everything at the end of the month anyway.

In that case, invest the 500,000 FCFA you were going to spend on three things instead: a clean, locked-down spreadsheet template; an automatic off-site backup (hard drives crash more often than they get stolen); and two hours of training for a second person. A well-managed spreadsheet beats a poorly used ERP system, every day of the week.

Signs that the spreadsheet is no longer enough

  1. Two people give you two different figures for the same inventory.
  2. You’re manually invoicing customers who require an invoice certified by the DGI.
  3. You spend more than two days a month reconstructing data instead of analyzing it.
  4. You’ve already lost a file, or you don’t know who changed what.
  5. You’re opening a second retail location or a second warehouse.
  6. You accept payments via Mobile Money, and reconciling them with sales takes hours.

Two warning signs are enough to trigger an investigation. Four warning signs, and the cost of inaction already exceeds the price of the software.

Decision Matrix

CriterionSpreadsheetGeneric SoftwareConfigurable or Custom ERP
Concurrent users1 to 23 to 2510 or more
Number of invoices per dayless than 2020 to 200more than 150
Multi-warehouse inventoryNoDepends on the productYes
Certified invoice formatNot possibleTo be verified on a case-by-case basisYes, if the tool is connected to the billing system
Specific business processYes, manuallyNoYes
Behavior during an internet outageContinuousMost often freezesDepends on the hosting provider; to be demonstrated
Setup timeimmediate2 to 6 weeks3 to 6 months
Dependence on a service providernoneModerateHigh

The actual cost, in CFA francs

The ranges below are estimates based on projects observed in Benin and the WAEMU region. They are intended to frame a discussion, not to replace a formal quote. Amounts do not include taxes.

OptionSetupRecurring Cost
Fully Equipped Spreadsheet0 – 200,0000–6,000 per user per month
Generic software or industry-specific SaaS200,000 – 900,00015,000 – 90,000 per month
Existing ERP customized for youStarting at 2,500,000Starting at 150,000 per month for maintenance and managed services
Custom-developed ERP6,000,000 – 25,000,000Starting at 150,000 per month for maintenance and managed services

A quick note on a common misconception: maintenance for management software is calculated as a monthly fee, not as a percentage of the project budget. With us, it starts at 75,000 FCFA per month for a showcase website and 150,000 FCFA per month for an application or ERP, regardless of the development cost.

Costs that no one includes in the quote

  • Migrating existing data: 150,000 to 800,000 FCFA. Cleaning up ten years’ worth of spreadsheets takes longer than installing the software.
  • Training: starting at 75,000 CFA francs per participant for two days, to be re-budgeted each time an employee leaves. This is the most cost-effective line item—and the first to be cut.
  • UPS and backup: 60,000 to 250,000 CFA francs. Non-negotiable given the power grid we have.
  • Backup connection: 15,000 to 35,000 FCFA per month for a second line with another provider.
  • Your time: the heaviest real cost. Expect one person to be dedicated 30% of the time for two to three months on an ERP project. If no one is available internally, the project will fail, regardless of the service provider.

A simple rule of thumb: always compare the cost in the third year, not the first. A subscription at 80,000 FCFA per month totals 2,880,000 FCFA over three years—often more than the cost of a custom-built solution you own.

Local constraints that must be considered in the decision

Software that works perfectly in Paris may be unusable in Cotonou. Four points to test before signing a contract:

  • Functionality during outages. What happens during a two-hour internet outage? An online-hosted tool suspends data entry until service is restored; a tool installed on an on-premises server continues to serve the internal network. Ask for a demonstration of how it actually behaves—don’t settle for sales promises.
  • Mobile Money. MTN Mobile Money, Moov Money, and aggregators like FedaPay or CinetPay are not optional. If they aren’t natively integrated, your teams will have to enter transaction records manually.
  • Tax compliance. Certified invoicing, VAT, AIB, SYSCOHADA chart of accounts. Software that ignores these elements will force you to re-enter your data elsewhere. Be careful with what salespeople say: a good tool issues your invoices in the required format and keeps you compliant without you having to think about it, but it doesn’t file your tax returns for you—that remains your responsibility and that of your accountant. Also ask the follow-up question that few business owners dare to voice: ensuring compliance doesn’t give anyone access to your business data. With us, every client has their own dedicated instance; their data belongs to them, isn’t shared with any other client, and no third party has access to it.
  • On-site support in French, always available. A ticket-based support system with a 48-hour response time is useless when the point-of-sale system is down on a Saturday morning. The commitment we demand is about response time: at IK'ART, a critical issue covered by a maintenance contract is addressed within 4 business hours. We focus on response time, never on a resolution timeframe—no one can honestly guarantee that.

Six questions to ask before signing

  1. Who owns my data, and in what format can I export it? Demand a written response. A CSV export or database backup must be provided upon request.
  2. What happens if you go out of business? Source code, documentation, server access. This is an uncomfortable question, but it’s the most important of the six.
  3. Are invoices generated by the tool accepted as-is by the tax authorities? Ask to see an actual invoice issued to a client, complete with its QR code—not just a verbal assurance.
  4. How much does it cost in the third year? Licenses, maintenance, hosting, updates—all-inclusive.
  5. Can I see the tool in use at a client similar to mine? A sales demo is no substitute for a site visit.
  6. Who trains my cashier’s replacement when they leave? And at what cost?

Regarding the second question, the architecture matters just as much as the contract. The ERP systems we deploy at IK'ART run on a dedicated instance per client, with its own isolated database and daily backups, specifically so that your data remains yours: it is not shared with any other client, no third party has access to it, and you can export it or have it restored upon request. Other approaches exist; what matters is knowing which one you’re purchasing.

Our terms and conditions are clearly laid out in writing in the quote, provided in CFA francs within 48 hours after the scoping meeting: a management application or ERP project starts at 2,500,000 CFA francs (excluding tax) for 3 to 6 months of implementation, the payment schedule is 40% at project kickoff, 30% upon acceptance, and 30% upon go-live; the corrective warranty covers 30 days after go-live; and upon payment of the balance your data is yours and, for custom development, the code written for you is assigned to you. Ask all your service providers for the same details: if one refuses to put them in writing, that should already raise a red flag.

Decide in three steps

  1. Do the math before comparing. Number of invoices per day, SKUs in stock, data entry staff, and locations. Four figures, one hour of work. Without them, all quotes look the same.
  2. Start with a limited scope. Sales and inventory first, accounting and payroll next. A project that begins with “we’re computerizing everything” ends with “we’re back to using spreadsheets.”
  3. Budget for three years and one person. The software budget isn’t complete unless it includes training, backup equipment, and the internal time of the system administrator.
The right software isn’t the one with the most features—it’s the one your teams will still be using in eighteen months.

If you’re still on the fence, try this test: list the three decisions you can’t make today because you lack reliable data. If a tool can provide those figures in less than three months, it’s worth the price. Otherwise, stick with your spreadsheet, lock it down, back it up, and revisit the issue in six months.

A software project to scope?

Tell us what you need. We come back with a scope and a costed quote.

Discuss my project